How long does a kitchen or bathroom remodel take?

Most kitchen remodels take about 6 to 12 weeks of construction and a full bathroom about 2 to 8 weeks, according to the major cost guides [1][2][3][4][6]. Planning, ordering and permits add weeks before the first hammer swings, and that's where most delays start.

Typical timelines by project

In a This Old House survey of 1,000 homeowners, nearly two-thirds said their bathroom remodel took 1 to 4 weeks, and about 1 in 5 said it ran past a month, usually because of contractor availability, backorders or surprises behind the walls [8].

ProjectTypical durationSources
Kitchen, cosmetic update1 – 2 weeksAngi, Fixr [1][2]
Kitchen, midrange (new cabinets, counters, appliances)4 – 8 weeksAngi [1]
Kitchen, full remodel6 – 12 weeks (Angi: most take 6–10)Angi, Fixr, HomeGuide [1][2][3]
Kitchen with structural changes or custom work3 – 8 months start to finishFixr, HomeGuide [2][3]
Small bathroom2 – 4 weeks (avg. 23 days)Angi, HomeGuide [5][7]
Full bathroom2 – 8 weeks of work; 2–3 months including planningFixr, HomeGuide, Angi [4][6][5]
Bathroom with layout changes6 – 12+ weeksHomeGuide [6]
Tub-to-shower conversion2 – 7 days; custom tile 1–2+ weeksHomeAdvisor, This Old House, Fixr [11][12][13]

A kitchen remodel, phase by phase

  1. Planning and design: two weeks to a few months, depending on how many decisions are still open [1].
  2. Ordering: the long pole. Stock cabinets ship in 1 to 5 weeks, semi-custom in about 4 to 8, and custom in 2 to 6 months [2][9]. Order before demolition.
  3. Permits: one to four weeks [1][2]; see local review times below.
  4. Demolition: 1 to 3 weeks for a full kitchen [1][2].
  5. Rough-in and inspection: plumbing and electrical take a few days, and must pass inspection before cabinets and countertops go in [1][2].
  6. Install: cabinets 2 to 3 days, flooring 1 to 3 days [2]. Countertops are templated after cabinets are in, then fabricated: about a week for quartz and 2 to 3 weeks for granite, installed in a day [10][14].
  7. Finishes and final inspection: 1 to 3 weeks for backsplash, lighting, appliances and punch list [2].

A bathroom remodel, phase by phase

Angi's sample schedule for a full bathroom: demolition 1–2 days, plumbing 2–3 days, electrical 2 days, a rough-in inspection, drywall 3 days, tile and floors about 2 days each, then fixtures, paint and a final inspection [5]. Plan on at least 3 to 4 weeks of planning and a week or two for permits before that starts [5].

How long permits take in metro Atlanta

Permit review is the part your contractor controls least. Published review times from the cities in our 2026 Atlanta Remodel Cost & Permit Report [15]:

JurisdictionPublished review time
Peachtree CityResidential permits usually 3–5 business days [15]
City of StonecrestStaff reviews up to 10 business days; resubmittals up to 5 [15]
City of AtlantaExpect about 10 days to 2 weeks for initial review [15]
City of McDonoughSame day for simple residential work, up to four weeks for complex projects [15]
DeKalb County (unincorporated)Not published; varies by project and completeness [15]

How to keep your remodel on schedule

Common questions

How long does a kitchen remodel take?

A full kitchen remodel usually takes 6 to 12 weeks of work, and 3 to 8 months start to finish if it involves structural changes or custom cabinets [1][2][3].

How long does a bathroom remodel take?

Most full bathroom remodels take 2 to 8 weeks of work, or 2 to 3 months including planning; a small bathroom averages about 23 days [4][5][6][7].

How long does it take to get a remodeling permit in Atlanta?

The City of Atlanta says to expect about 10 days to 2 weeks for initial review; Peachtree City usually issues residential permits in 3 to 5 business days [15].

Related

Sources

  1. Angi, How Long Does a Kitchen Remodel Take? (updated July 8, 2026)
  2. Fixr, How Long Does a Kitchen Remodel Take? (January 13, 2025)
  3. HomeGuide, Kitchen Remodel Cost (2026) (December 31, 2025)
  4. Fixr, Bathroom Remodeling cost guide (updated January 27, 2026)
  5. Angi, How Long Does a Bathroom Remodel Take? (updated July 9, 2026)
  6. HomeGuide, Bathroom Remodel Cost (June 20, 2025)
  7. HomeGuide, Small Bathroom Remodel Cost (October 25, 2025)
  8. This Old House, Bathroom Remodel Cost in 2026 (homeowner survey) (updated July 2, 2026)
  9. This Old House, All About Kitchen Cabinets (updated June 8, 2026)
  10. This Old House, Quartz Countertops buying guide (updated April 10, 2026)
  11. HomeAdvisor, Tub to Shower Conversion Cost (updated June 17, 2026)
  12. This Old House, Tub-to-Shower Conversion Cost (updated March 4, 2026)
  13. Fixr, Bathtub to Shower Conversion (January 23, 2025)
  14. Fixr, Granite Countertops Cost (updated January 31, 2025)
  15. Kitchen & Bath ATL, 2026 Atlanta Remodel Cost & Permit Report (each city's review time linked to its official page) (November 2026)
  16. Georgia Department of Law, Consumer Protection Division: Home Repair & Improvements (accessed November 2026)

This guide is general information, not legal, insurance or financial advice. How we research.